A development & design proposal prepared for DJ Trauma

Investment Property · Joshua Tree, CA
THE VISION

A fast, amenity-driven investment property.

A single manufactured/prefab home, built with a pool, tennis court, and outdoor entertaining spaces to command a real experiential-rental premium, designed from the start as an experience rather than a commodity build. Sparrow + Aire Studio acts as Development & Design Director across the full engagement: land development, manufactured home selection and production, construction management, exterior amenity build-out, and interior/furnishing for a short-term-rental-ready property.

THE PROPERTY

What this parcel is for.

01

Investment Property

A single manufactured/prefab home, sized to match San Bernardino County's short-term rental permit rules, plus a full amenity package built for a $400–$600/night positioning.

  • Pool
  • Tennis court
  • Outdoor kitchen & covered patio
  • Outdoor showers
  • Landscape & hardscape
HOME VENDOR OPTIONS

Two housing paths, client's choice.

A

Homes Direct

Factory-direct manufactured home, Perris CA. $30K–$150K base. Fastest, most cost-controlled path to a completed structure.

B

Blue View

Adobe/Spanish-style custom prefab, $200–$360/sf. Higher upfront cost, stronger design-forward positioning that pairs naturally with the amenity package.

THE ENGAGEMENT

How this unfolds.

Land Development

60 days

Feasibility, utilities, entitlements pathway, and a design master plan before capital commits to construction.

Manufactured Home Selection & Concept

60 days

Vendor sourcing, customization, and a siting/design concept, built cost-efficient, designed to still feel intentional.

Construction Management

Build-out

Site prep, utility hookup, and manufactured home installation through certificate of occupancy.

Amenity Build-Out & Interior Design

After the structure is fully built

Pool, tennis court, and outdoor entertaining spaces, plus interior concept, sourcing, and furnishing to bring the property to short-term-rental-ready condition at the $400–$600/night positioning.

HOW THIS RUNS

Development Process & Protocol.

How this engagement flows from land development through move-in ready handoff, and how we stay aligned every step. This protocol is referenced in the agreement and shared with vendors at kickoff.

ENGAGEMENT FLOW
01Phase

Land Development

Feasibility, entitlements, and design master plan
Due Diligence Percolation Testing Utility Feasibility Entitlement Pathway STR Permit Check Design Master Plan
Site Design Package $2,750 flat · Coordination under Admin & Development retainer

Work begins immediately upon signed agreement and first retainer payment. Due diligence, feasibility testing, and entitlement coordination run in parallel to hit a compressed timeline. Design master plan delivered by week 8; engineered site plan (licensed civil engineer) billed at cost. County review turnaround (perc, grading) is the one variable outside Sparrow + Aire's control that could push this slightly.

Ongoing

Admin & Development Retainer

Runs from signing through project completion, alongside every phase below
Weekly Vendor Check-Ins County Liaison Weekly Client Update Site Visits Change Request Log
$2,000–$3,000/mo · Billed monthly, in advance

Sparrow + Aire owns every decision, vendor negotiation, and design call. Under the Shared Responsibility tier, Tiffany acts as day-to-day co-quarterback, first point of contact for routine communication, schedule coordination, and project tracking, escalating real decisions to Sparrow + Aire.

Milestone

Master Plan Approved

Client signs off on the design master plan and Phase 2 scope
Phase 2 statement of work issued at approval

Once the design master plan and entitlement roadmap are approved, Phase 2 scope and vendor budget are finalized based on Phase 1 findings. This milestone gates the move into home selection.

02Phase

Manufactured Home Selection & Concept

Vendor sourcing, concept development, and customization
Concept & Brand Positioning Homes Direct Blue View Floor Plan Customization Production Scheduling
20% sourcing fee · PM $125/hr

Vendor comparison runs against both Homes Direct's published floor plans and Blue View's custom adobe/Spanish pricing. A written cost summary is sent for approval before any deposit is placed.

Milestone

Home Package Approved

Client signs off on the vendor selection and final floor plan
Production deposit due at approval

Once the home package is approved in writing, the production order and delivery schedule begin. This milestone gates the move into active construction.

03Phase

Construction Management

Site prep through certificate of occupancy
Site Prep & Foundation Utility Hookup Home Delivery & Set Punch List Tracking Inspections Certificate of Occupancy
PM $125/hr · capped 20–25 hrs/week

Given the 2-hour distance to Joshua Tree, on-site presence is milestone-driven rather than routine. Sparrow + Aire coordinates all trades and inspections remotely between visits.

Trigger

Furnishings Sourcing Begins

Structure complete: procurement opens
Written notice sent · client confirmation required · clock starts

Once the manufactured structure is set and move-in ready for finishing, a formal written notice is sent confirming the sourcing phase is opening. DJ Trauma confirms in writing before any procurement hours begin.

04Phase

Amenity Build-Out & Interior Design

The final layer, added after the structure is fully built, not the build itself
Pool Tennis Court Outdoor Kitchen & Patio Landscape Interior Design Procurement & Furnishings Installation & Staging
Amenity construction billed at cost · $8/sqft or per-room design · procurement $125/hr + 20% · install $500/day

Pool and tennis court contractors are managed the same way as every other trade, weekly schedules, 48-hour confirmations, milestone visits. All interior samples and finishes are invoiced to DJ Trauma before any order is placed. No purchase is made without written approval and pre-payment.

Closeout

Closeout

Final walkthrough, punch list, and handoff
Punch List Review Final Walkthrough Handoff Documentation
Final retainer invoice issued at completion

Sparrow + Aire reviews completed work against the design master plan and approved specifications before handing the property over move-in ready and STR-ready.

SITE & VENDOR COORDINATION

Site Coordination Protocol.

This protocol is referenced in the project agreement and introduced to every vendor and contractor at kickoff. It is how the project stays on schedule and on budget, without DJ Trauma having to manage any vendor directly.

Weekly Client Check-In

One written update sent each week during active phases, covering progress, decisions needed, and what's next.

  • What was completed this week and what is still outstanding
  • What is behind schedule and why
  • Decisions needed from you before Monday
  • What is scheduled for the following week
  • Site photos included when gathered from a milestone visit or shared by trades
  • Ad hoc calls available for time-sensitive decisions between check-ins
Vendor & Production Meetings

Every other week during Phases 2 and 4, a structured meeting covers vendor selections, production status, and sourcing decisions.

  • Homes Direct & Blue View production status
  • Floor plan and finish selections requiring approval
  • Furnishings and material sourcing decisions
  • Budget tracking against sourcing and procurement fees
01
Vendor & Trade Introduction at Kickoff

At kickoff, Sparrow + Aire is introduced to every vendor and trade, Homes Direct, Blue View, the pool and tennis court contractors, the civil engineer, surveyor, and other trades, as DJ Trauma's design and coordination point of contact. This is documented in the project agreement and communicated in writing to all parties.

02
Weekly Client Check-In

One written update is sent each week during active phases, covering what was completed, what is behind schedule and why, and what decisions are needed before Monday. Ad hoc calls are available for time-sensitive decisions between check-ins.

03
Weekly Schedule to Vendors

Every Monday, Sparrow + Aire sends a written schedule to the active vendor or contractor confirming what is expected on site or in production that week. This keeps the phase sequenced regardless of vendor lead times.

04
48-Hour Confirmation

48 hours before any scheduled delivery, install, or critical milestone, Sparrow + Aire confirms with the vendor or contractor. If something is slipping at this point, there is still time to adjust sequencing or escalate, protecting the timeline from last-minute disruption.

05
Milestone Site Visits

Joshua Tree is 2 hours away, so on-site presence is milestone-driven, not routine. Phase 1 land development is largely administrative and coordinated remotely. Physical visits are required at key milestones: home selection walkthrough, survey/staking confirmation, and water/septic placement. Between milestones, updates are gathered directly from vendors and trades and passed to DJ Trauma in the weekly report.

06
Escalation Protocol

Sparrow + Aire coordinates every vendor and trade but does not hold final authority over budget or scope, DJ Trauma does. When a delay, deviation, or quality issue arises, it is documented immediately and flagged in writing with the timeline impact and a recommended next step. DJ Trauma directs the next move from there.

07
Friday Status Report

Every Friday, a concise written summary is sent: what was completed, what is behind and why, what decisions are needed before Monday, and what is scheduled for the following week. Site photos are included when gathered from a milestone visit or shared by trades on site.

Vendor coordination, site logging, schedule management, and weekly check-ins are all billable PM time at $125/hr, not absorbed into the Admin & Development retainer. All hours are tracked and reported monthly so DJ Trauma always sees exactly what he is being billed for.
WHO OWNS WHAT

Responsibility matrix.

Responsibility Sparrow + Aire Licensed Third Party DJ Trauma
Design master planAuthors & deliversReviews & approves
Engineered site planCoordinatesCivil engineer stamps & deliversPays at cost
Vendor sourcing & comparisonLeadsApproves final selection
County & permittingCoordinates & tracksCounty issues permitsSigns applications as owner of record
Construction managementOverseesContractor buildsApproves change orders
Interior design & furnishingsDesigns & sourcesApproves selections & budget
Timely decisions & accessProvides approvals & property access on schedule
TOTAL INVESTMENT PLANNING

Financial Roadmap.

Itemized cost estimates built from current San Bernardino County fee schedules, verified recent Joshua Tree land development comparables, and live short-term rental market data. These are planning-grade ranges, not bids. Phase 1 testing locks in the real numbers before capital commits to construction.

Phase 1: Land Development
ItemLowHighBasis
Percolation testing$1,800$1,800Verified recent JT comparable
SB County perc/soil review fee$1,500$1,500County engineering review
Boundary/topo survey$2,000$2,000Verified recent JT comparable
Well drilling$35,000$60,000$35K verified starting point; depth unknown until drilled
Septic design & install$15,000$25,000Includes grading/drainage layout, bundled by septic engineer
SB County grading plan review$600$900County fee; often bundled into septic engineer's scope if under 100 cu yd, confirm in Phase 1
SB County erosion/drainage review$400$1,100County fee; same bundling applies, separate civil engineer only if total site disturbance exceeds 100 cu yd
Power — off-grid solar (alt.)$15,000$35,000Per structure
Power — grid extension (recommended if close)$50,000$50,000$50/linear ft × 1,000 ft to grid, verified JT comparable; scales with actual distance
STR permit application$1,144$1,144SB County flat fee, confirmed
Subtotal (off-grid scenario)$57,444$92,444Excludes grid extension; add $50K+ if grid is selected

Sources: San Bernardino County FY26 Building & Safety / Land Development fee ordinances; verified recent Joshua Tree land development comparable (survey, perc test, power, well costs); HomeAdvisor/Fixr contractor cost data.

Phase 2–3: Manufactured Home & Construction
ItemLowHighBasis
Option A — Homes Direct base unit$70,000$110,000Factory-direct, Perris CA
Option A foundation, delivery, hookup$14,000$33,00020–30% of unit cost
Option A Subtotal$84,000$143,000
Exterior siding enhancement buffer$15,000$35,000Post-delivery re-clad over stock siding: wire-brushed wood, black steel accents. Ref: Alana Marie Interiors' Malibu mobile home reskin
Option B — Blue View custom (~900sf)$180,000$324,000$200–$360/sf, adobe/Spanish style, foundation & delivery included in per-sf pricing

Sources: Homes Direct (Perris, CA) published base pricing; Blue View Manufactured & Modular per-sqft pricing.

Phase 4: Amenities, Interior Design & Furnishing
ItemLowHighBasis
Pool (gunite, desert site prep)$70,000$130,000CA average + remote site prep premium
Tennis court$60,000$100,000Full regulation court, fencing included
Outdoor kitchen + covered patio$25,000$50,000Contractor benchmark
Outdoor showers$3,000$6,000
Landscape/hardscape$20,000$40,000Drought-tolerant desert landscape
Amenity Subtotal$178,000$326,000
Furnishings, STR-ready$18,000$32,000Boutique-tier, before 20% procurement fee
Total Estimated Investment (excludes land cost and Sparrow + Aire fees): ~$337,000 low case (Homes Direct, off-grid, lean amenity build) to ~$774,000 high case (Blue View custom, full amenity build). Phase 1 testing narrows this range substantially before any construction capital commits.
STR ROI MODEL

What the investment property can return.

Blended from AirDNA, Rabbu, and GuestFavorites live Joshua Tree market data. Benchmarked against the Isaac French / Rob Abasolo experiential-hospitality model: the shell cost is fixed, design quality is what moves a property from market-average into the top performance tier.

Conservative — Market Average

Occupancy55%
ADR$290
Gross revenue~$58,200/yr
Net (after 35–45% opex)~$32K–$38K/yr

Optimistic — Design Premium

Occupancy78%
ADR$320
Gross revenue~$91,100/yr
Net (after 35–45% opex)~$50K–$59K/yr

Target — Pool & Amenities

Occupancy45–55%
ADR$400–$600
Gross revenue~$66K–$120K/yr
Net (after 35–45% opex)~$36K–$78K/yr
Payback depends heavily on vendor tier. Against Option A (Homes Direct) + lean amenity build (~$262K combined): roughly 3.3–7.3 years at Target-tier net income. Against Option B (Blue View) + full amenity build (~$650K combined): roughly 8.3–18 years. This is the single biggest lever in this whole roadmap, the home vendor and amenity scope decision drives payback more than any other choice.
San Bernardino County caps STR permits at 2 per parcel 2+ acres. This 1-unit plan leaves room for a second unit under that cap later without a new permit application. 7% TOT tax and the $1,144 permit fee are already reflected in the Phase 1 table above.

Sources: AirDNA Joshua Tree market data (June 2026); Rabbu Airbnb market data (Apr 2026); GuestFavorites Joshua Tree occupancy tiers (June 2026); Isaac French (Live Oak Lake) and Rob Abasolo (Robuilt) public case studies on design-driven ADR premium. Target tier comparable to active JT listings with pool/amenity packages: Colorful Cactus (4BR, hot tub/BBQ/fire pit) $528–$532/night, Sacred Sands — Lobo Luna $510/night, The Rosemary House (private pool + hot tub) $444/night.

INVESTMENT

Fee Structure

Site Design Package

One-time flat fee, the creative and strategic work, bounded and paid once, not billed monthly
Design master planUnit placement, siting, orientation
Included
Concept & brand positioningNaming, material & design language, site experience mapping before vendor selection
Included
Exterior siding enhancement directionDesign language for the post-delivery re-clad, wire-brushed wood, black steel accents
Included
Site Design Package total
$2,750 flat

Admin & Development Retainer

Ongoing coordination only, design work is no longer bundled in here. Three options, side by side.
Responsibility OPTION AFull-Service OPTION BShared Responsibility OPTION CAd Hoc Advisory
Rate$3,000/mo$2,000/mo$175/call (30 min) or $150/hr
Vendor selection & negotiationSparrow + AireSparrow + AireOn request, billed per call
Design master plan & conceptSparrow + AireSparrow + AireNot included, one-time deliverable already complete
Budget oversight & approvalsSparrow + AireSparrow + AireDJ Trauma/Tiffany manage directly
Escalation decisionsSparrow + AireSparrow + AireAvailable per call
Final walkthroughs & QCSparrow + AireSparrow + AireAvailable per visit, billed separately
Day-to-day point of contactSparrow + AireTiffany, escalates real decisionsDJ Trauma/Tiffany handle directly
Weekly schedule coordinationSparrow + AireTiffanyNot included, client-managed
Friday status reportCompiled & sent by Sparrow + AireDrafted by Tiffany, reviewed & sent by Sparrow + AireNot included
Milestone site visitsSparrow + Aire attends every visitTiffany accompanies; stands in for non-critical check-insAvailable per visit, billed separately
Project tracker & invoice logSparrow + AireTiffanyClient-managed
Best fitWants one expert handling everythingFamily wants active involvement, lower rateOccasional expert input only, no ongoing retainer

Project Management

Phase-specific hourly work beyond the retainer's general oversight
PM hoursVendor coordination, production scheduling, construction oversight
$125/hr

Admin & Development Retainer

The strategic oversight layer, judgment, not tasks
  • Owns the vision for the property
  • Applies the Site Design Package day to day as decisions arise
  • Single accountable point of contact
  • Makes the calls with no script, vendor pushback, failed tests, scope tradeoffs
  • Available even in quiet weeks
Billed flat, monthly, accountability doesn't scale with hours

Project Management

The tactical layer, execution, not vision
  • Schedules inspections & deliveries
  • Tracks specific dates & punch-list items
  • Fluctuates by phase, heavy in construction, light in permitting
  • Time-based, hands-on work
Billed hourly, as incurred, pay for time actually spent

Sourcing & Procurement

Manufactured home sourcingApplied to vendor package cost
20%
Furnishings & finishes procurementApplied to all sourced items
$125/hr + 20%

Interior Design & Furnishing

Design services fee, separate from procurement and construction. Applied once square footage / room count is confirmed in Phase 1
Interior design servicesMoodboards, 3D renders, floor plans, design concepts, material boards, whole-unit sqft rate or per-room, whichever nets higher
$8/sqft or $1,800–$2,800/room
Installation & stagingOverseeing deliveries, layout, assembly, mounting
$500/day

Phase 1: Land Development

60 days
Site Design PackageDesign master plan, due at signing
$2,750 flat
Coordination & oversightDue diligence, feasibility testing, entitlement pathway
Covered under Admin & Development retainer
Passthrough costsSurveyor, licensed civil engineer (engineered site plan, grading, drainage, septic, utility routing), perc test, county fees, billed at cost, no markup
Billed as incurred

Phase 2: Manufactured Home Selection

60 days
Vendor split: Homes Direct (Perris, CA), factory-direct, $30K–$150K base, cost-controlled option. Blue View Manufactured & Modular (adobe/Spanish style, custom), $200–$360/sf, design-forward option that pairs with the amenity package.
Concept & brand positioningCovered under Site Design Package, no separate charge
Included
Vendor sourcing fee20% of manufactured home package cost
20%
PM hoursCapped at 40 hrs for this phase, $125/hr beyond
$125/hr

Phase 3: Construction Management

Build-out through CO
PM hoursCapped at 20–25 hrs/week
$125/hr

Phase 4: Amenity Build-Out & Interior Design

Applied after the structure is fully built, separate from construction costs
Pool, tennis court, outdoor kitchen & landscapeContractor bids, PM oversight included in retainer
Billed at cost + PM $125/hr
Interior design servicesMoodboards, 3D renders, floor plans, concepts, material boards
$8/sqft or $1,800–$2,800/room
Procurement & furnishingsSourcing and purchasing all furniture and finishes
$125/hr + 20%
Installation & staging
$500/day

Site Design Package

50%
Due at signingSecures engagement start, design work begins
50%
Due at design master plan deliveryEnd of Phase 1, ~week 8

Admin & Development Retainer

Mo. 1
Due at signingSecures engagement start, Phase 1 begins
Mo. 2+
Billed monthly, in advanceContinues across all phases through project completion

Phase-Specific Fees

Sourcing, procurement & PM hoursInvoiced monthly as incurred
Phase 4 interior design fees are invoiced once square footage and room count are confirmed from Phase 1 findings. Furnishings are billed separately through procurement, as items are sourced and purchased.
  • Two site plans, two ownersThe design master plan (unit placement, siting) is Sparrow + Aire's work, design authorship, covered under the Site Design Package. The engineered site plan (grading, drainage, septic, utility routing) requires a licensed civil engineer's stamp for permit submittal, this is not a scope choice, it's a licensure requirement, and is billed to DJ Trauma at cost with no markup.
  • Independent sourcingIf DJ Trauma sources a product similar to a designer-approved selection independently, the 20% coordination fee still applies to the purchase price.
  • Passthrough costsSurveyor, civil engineer, perc testing, and county application fees are billed at cost with no markup during Phase 1, this changes once sourcing/procurement begins in later phases.
  • Timeline expectationsPhase 1 delivers a roadmap and go/no-go decision point, not permits in hand. County entitlement timelines in San Bernardino often extend beyond 60 days regardless of internal pace.
  • County review contingencySan Bernardino County grading and drainage review commonly requires multiple submission rounds; a second round is normal, not a failure. If county review requires a second submission round, the Phase 1 timeline extends accordingly. This is covered under the existing Admin & Development retainer, with no additional design fee.
  • STR permittingSan Bernardino County caps short-term rental permits per parcel by acreage. This unit's income model is confirmed during Phase 1 before capital commits.
SCHEDULE

Project Timeline

Overall progress0%
WHO DOES WHAT

Responsibility by phase.

Phase 1: Land DevelopmentSparrow + AireTiffany
Title reports, surveys, APN records
County pre-application meeting
Zoning & manufactured home standards
STR permit eligibility
Percolation/soil testLeadsCoordinates on-site date
Water source feasibility
Power assessment
Access/easement review
County zoning/setback sign-off
Fire district access review
Dark sky ordinance check
Flood/wash zone confirmation
Design master plan
Engineered site planCoordinates
Site-prep budget
Phase 2 kickoff brief
Phase 2: Manufactured Home SelectionSparrow + AireTiffany
Concept & brand positioning
Vendor comparison (Homes Direct & Blue View)DecidesCoordinates calls
Floor plan/finish customization
Production scheduling & depositApproves depositCoordinates weekly schedule
Phase 3: Construction ManagementSparrow + AireTiffany
Site prep & foundationOverseesTracks progress between visits
Utility hookup
Home delivery & setMilestone visitAccompanies for notes/photos
Final inspections through CO
Phase 4: Amenity Build-Out & Interior DesignSparrow + AireTiffany
Pool & tennis court contractor managementOverseesTracks progress between visits
Landscape & exterior amenity design
Interior design
Procurement & furnishing sourcingSourcesTracks invoices/payments
Installation & stagingOverseesCoordinates delivery logistics

Phase 1: Land Development

60 days

Compressed from a standard 90-day sequence: feasibility testing, entitlement coordination, and due diligence run in parallel rather than back-to-back. County review turnaround (perc, grading) is the one variable outside Sparrow + Aire's control.

WEEKS 1–2: Due Diligence & Baseline
WEEKS 2–4: Feasibility Testing
WEEKS 4–6: Entitlement Pathway
WEEKS 6–8: Master Plan & Handoff
Deliverables: Days 1–60
  • Due diligence binder, title, surveys, APN records
  • Zoning compliance memo, manufactured housing permitted, setbacks confirmed
  • Utility feasibility report, water/well, power/solar, septic, cost ranges
  • Percolation/soil test results
  • Fire district & dark sky ordinance compliance notes
  • Flood/wash zone clearance
  • STR permit eligibility confirmation
  • Design master plan, unit placement and siting
  • Preliminary site-prep budget
  • Phase 2 statement of work

Phase 2: Manufactured Home Selection

60 days
Deliverables: Days 61–120
  • Concept & brand positioning document, naming, material palette, site experience narrative
  • Homes Direct & Blue View floor plan comparison
  • Selected home package: ~800–1,000 sqft
  • Finalized floor plan and customization specs
  • Production order, deposit, and delivery schedule

Phase 3: Construction Management

Build-out
Deliverables: Build-Out
  • Weekly PM status reports through the build
  • Site prep, foundation, and utility hookup sign-off
  • Manufactured home delivery & set
  • Punch list and inspection tracking
  • Certificate of Occupancy, income-ready milestone

Phase 4: Amenity Build-Out & Interior Design

After the structure is fully built
Deliverables: Final Phase
  • Completed pool, tennis court, outdoor kitchen & landscape
  • Interior design concept, drawings, and renders (2 revisions included)
  • Procurement and sourcing of furnishings and finishes
  • Installation & staging
  • Final walkthrough and move-in-ready, STR-ready handoff at $400–$600/night positioning
TASK OWNERSHIP

Sparrow + Aire vs. Tiffany.

Every task on the project timeline, mapped to who owns it and why. The pattern holds throughout: decisions, design, money, and signatures stay with Sparrow + Aire. Scheduling, tracking, and logistics can move to Tiffany.

Sparrow + Aire Tiffany
Phase 1: Land Development
TaskOwnerWhy
Pull title reports, surveys, APN recordsS+ARequires judgment on what's needed for entitlement
County pre-application meetingS+ASubstantive county liaison
Confirm zoning & manufactured home standardsS+ADetermination affects the entire build
Confirm STR permit eligibilityS+ALegal & financial implication
Percolation/soil testS+Aleads; Tiffany confirms the vendor's on-site date
Water source feasibilityS+AJudgment call with major cost impact
Power assessmentS+AJudgment call with major cost impact
Access/easement reviewS+ALegal review
County zoning/setback sign-offS+ACounty liaison
Fire district access reviewS+ACompliance determination
Dark sky ordinance checkS+ACompliance determination
Flood/wash zone confirmationS+ARisk assessment
Design master planS+ASite Design Package deliverable
Engineered site planS+A coordinatesCivil engineer's stamped work; S+A manages the relationship
Site-prep budgetS+AFinancial judgment
Phase 2 kickoff briefS+AStrategic handoff
Phase 2: Manufactured Home Selection
TaskOwnerWhy
Concept & brand positioningS+ASite Design Package deliverable
Vendor comparison: Homes Direct & Blue ViewS+Adecides; Tiffany coordinates calls
Floor plan/finish customizationS+ADesign authorship
Production scheduling & depositS+Aapproves the deposit; Tiffany coordinates the weekly schedule
Phase 3: Construction Management
TaskOwnerWhy
Site prep & foundationS+Aoversees; Tiffany tracks progress between visits
Utility hookupS+ATechnical oversight
Manufactured home delivery & setS+AMilestone visit, requires physical presence for QC; Tiffany can accompany
Final inspections through COS+ACompliance sign-off
Phase 4: Amenity Build-Out & Interior Design
TaskOwnerWhy
Pool & tennis court contractor managementS+Aoversees; Tiffany tracks progress between visits
Landscape & exterior amenity designS+ADesign authorship
Interior designS+ADesign authorship
Procurement & furnishing sourcingS+Asources & negotiates; Tiffany tracks invoices
Installation & stagingS+Aoversees; Tiffany coordinates delivery logistics